1, check
The first step in circuit acceptance is to check. It is necessary to check whether the switch sockets of the house are normal, the quantity and safety are qualified. In addition, it is necessary to see if the intercom and emergency call buttons are normal, and then pay attention to whether the doorbell is closed. Normally available, these are details and must not be ignored.
2. Safety of electrical circuit switch box
After completing the basic inspection, it is necessary to check the safety of the switch box of the electrical circuit. In order to ensure the safety and convenience of the electrical circuit, the number of residential circuits should not be less than 5, and the switch in the switch box should be Install firmly, shake it to see if it is loose, you should ensure that each branch switch has obvious mark. If it is not or is unclear, you should immediately request correction, and then check and accept.
3, electric pen test socket panel
It is very necessary to test the socket panel with the electric pen. After the two steps before the acceptance, be sure to test the socket panel with electric pen. Do not ignore the switch panel of each socket, because no matter which one is the problem, it will affect the future. Normal use, so don't be lazy at this time, it's wise to test each to make sure there is no problem.
In addition, it is necessary to check the wiring condition of the socket switch lamp. You can turn off the socket switch in the switch box, and then turn it on after the indicator is off. If you test it frequently several times, you can see whether the switch wiring is good, and whether the socket safety problem is passed. It is.
4, pull valve power failure test
The pull-off test must be indispensable. If the switch and the meter are outdoors, then you should check whether the indoor lights and switches can be controlled normally. The method used is actually very simple, that is, whether the room is completely closed after the brake is opened. If the power is turned off, if there is a switch in the room, then the control of the switch should be checked separately to see if the branch lines can be completely controlled.
5, see if the meter is powered
The final step of circuit acceptance is to see if the meter is normally energized. At present, most of the meters used in the home are 10 (40) A single-phase watt-hour meters. If there is abnormal operation, whether it is too fast or too slow, it should be carried out. Warranty, you must remember to copy the number of electricity before and after the renovation, because the decoration process will use electricity, if the contract stipulates that the owner is not responsible for the cost of this part, then it is necessary to repair the company to undertake, do a good job of data backup in advance can do Be prepared.
ZGAR AZ MC Disposable
ZGAR electronic cigarette uses high-tech R&D, food grade disposable pod device and high-quality raw material. All package designs are Original IP. Our designer team is from Hong Kong. We have very high requirements for product quality, flavors taste and packaging design. The E-liquid is imported, materials are food grade, and assembly plant is medical-grade dust-free workshops.
Our products include disposable e-cigarettes, rechargeable e-cigarettes, rechargreable disposable vape pen, and various of flavors of cigarette cartridges. From 600puffs to 5000puffs, ZGAR bar Disposable offer high-tech R&D, E-cigarette improves battery capacity, We offer various of flavors and support customization. And printing designs can be customized. We have our own professional team and competitive quotations for any OEM or ODM works.
We supply OEM rechargeable disposable vape pen,OEM disposable electronic cigarette,ODM disposable vape pen,ODM disposable electronic cigarette,OEM/ODM vape pen e-cigarette,OEM/ODM atomizer device.
ZGAR AZ MC Vape,ZGAR AZ MC Vape disposable electronic cigarette,ZGAR AZ MC vape pen atomizer ,AZ MC E-cig,AZ CC Vape disposable e-cigarette
ZGAR INTERNATIONAL(HK)CO., LIMITED , https://www.oemvape-pen.com